Saturday, November 20, 2010

Without a word

I shouldn't have done it,
I should have ignored it.
As though I couldn't see you,
as though you couldn't be seen.
I think I should have just not
seen you at all.
I should have run away,
should have pretended not to hear.
As though I couldn't hear it,
as though it couldn't be heard,
I shouldn't have listened
to your love at all.

Without a word,you made me know love.
Without a word,you gave me your love.
You filled me with your every breath,
then you ran away.

Without a word,love left me.
Without a word,love lossed me aside.
Not knowing what to say,
my lips must have been surprised,
because you came without a word.

Without a word,you made me know love.
Without a word,you gave me your love.
Made me fill myself with your every breath,
then you ran away.
Without a word,love left me.
Not knowing what to say,
my lips must have been surprised.

Without a word,tears are coming down.
Without a word,my heart is breaking apart.
Without belief,I'm waiting for love.
Without belief,I'm hurting for love.
I became a fool after my soul left,
and cried staring at the sky.

Without a word,parting has found me.
Without a word,parting has come to me.
Not prepared to let you go,
my heart must have been surprised,
because you came without a word.

Without a word,you came to me.
Without a word,you left.
Just like a passing fever,
it just needed to hurt for awhile,
and leave a small scar behind.

Friday, November 12, 2010

Hydro power crisis

Despite the huge potential in hydro power,Nepal is still suffering from the load shedding due to unclear vision.
The estimate capacity of the hydro power is about 85,000 MW as researched by some russian student who have never been in Nepal.However,this estimation varies from study to study.
Some researches estimated that the total hydro power is about 45,000 MW and some companies says its about 150,000MW. So, the proper estimated power needs to be calculated properly.
The power plant that are currently installed are mostly depended on the river's water supply.
Only one major plant can be run all season. Hence, there is not sufficient power plant that can be run in winter season.
If the industries are to be developed,then the hydro power should be developed as it totally relies on it.Some argues that if more power plants are installed,then there will be more energy and we have to sell it to the india or china. But, instead of doing that, we could establish more industries that utilizes the energy.
To sum up,the proper vision and research is necessary for the development of the hydro power in Nepal and reduce the energy crisis.

Thursday, November 11, 2010

phone apps to navigate traffic

Who isn't frustrated to stuck in the trafffic?Everyone does,So am I. I am also one of the many people who rush to work and stuck in heavy traffic frequently.I have heard about that we can know the traffic conditions of the roads by using the services provided by companies. But it isn't so reliable. For instance,if I heard that there is traffic jam from New Road to Baneshwor by using the sms service by some company, I didn't find any traffic jam when i go there.
But the good news.Now, we can have the instant knowledge of the traffic by using the new apps that provide information regarding the traffic. These phone apps uses the GPS system for knowing about the traffic conditions of the road. Though the apps aren't so powerful at the moment but the companies are trying to make it reliable.